Isuwa Khola Hydropower Project is a Peaking run-off-the-river type scheme located at Makalu VDC of Sankhawasubha district of Koshi zone of Eastern Region of Nepal. Isuwa Khola is tributary of Arun River. The headwork site is located about 8 km upstream of the confluence of Isuwa Khola and Arun River. All the project components are located at the right bank. Geographically, project is located at 27°37’00”N to 27°34’03”Nand87°11’23”E to 87°14’30”E with added co-ordinate 27°34’03”N to 27°32’56”N and 87°14’00”E to 87°14’30”E. Geographically, the project area lies in the Higher Himalayas in Eastern development region of Nepal. The land surface is somewhat rugged and rejuvenation of the river system, in the project area. Isuwa Khola flows towards south-west direction. The project is a “Peaking run-off-the-river” type hydropower project, with the provision of storage for 6-hour peak power generation. The project is designed by considering Isuwa Khola flow at an elevation of about 2005 masl. The intake of the project is planned to construct upstream of Narbuchaur village at the right bank of Isuwa Khola at an elevation of 2005 masl. Total catchment area of the project including Isuwa Khola is about 152.00 km2. The head available is 922 m.

DistrictSankhuwasabhaMakalu VDC
Existing Geo Coordinates (Block 1)Latitude: 87°11’23”E to 87°14’30”
E°37’00”N to 27°34’03”N
Longitude: 27°37’00”N to 27°34’03”N

Existing Geo Coordinates (Block 2)
Latitude: 27°34’03”N to 27°32’46”NLongitude: 87°14’00”E to 87°14’30”E
Diversion Dam
30 % completed
Type : Raised Weir with under sluice
No of Gates : 2 nos. under sluice gate(2mx3m)
FRL level : 2005 m
Length : 60 m (Avg)
Height : 25m
Intake
30 % completed
Type : Side Intake fitted with 1 no of trash rack
No of Opening : 1
Size of opening : 2.0 m x 3.0 m
Intake invert level : 1989.50 m
Headrace Pipe
30 % completed
Shape : Steel Pipe
Length : 6911.53 m
Diameter : 2.15 m
Slope : ~1 in 1000
Surge Tank
30 % completed
Type : Surface, concrete structure
Size : 30m x 10m x 8m (Effective size)
Penstock
30 % completed
Type : Surfaced & Buried
Material : Mild Steel & ASTM 517 Grade steel
Numbers : 1
Diameter : 1.80 m
Length : ~2500m
Powerhouse
30 % completed
Type : Surface
Size : 53.53m (L) x 10.40m (W) x 14.81m (H)
Gross head : 922 m
Net head : 914.05 m
Design flow : 12.60 cubic meter per second
Capacity : ~97.2 MW
Tailrace Canal
30 % completed
Level at just after powerhouse (NTWL) : 1080
Shape : Rectangular
Length :168.00 m
Cross-sectional area : 2.5 m wide X 2.7 m depth
Bed slope : 1 in 200
Turbines
30 % completed
Type : Horizontal Shaft Pelton Turbine
No of units : 4
Rated Speed : 750rpm
Efficiency : 96%
Generators
30 % completed
Type : SCR
Capacity : 4 nos. Each of 24.5 MW capacity
Voltage : 11 KV
Efficiency : 91%
Transmission line
30 % completed
Voltage : 220 kV
Length : ~22 Km
Connection : Planned Sitalpati Substation
Transformer
30 % completed
Type : Onan 3 Phase
No of unit : 4
Power factor : 0.8
Voltage ratio : 11/220
Frequency : 50Hz
Efficiency : 99%
Energy Generation
30 % completed
Dry energy : 262.54 GWh(Including peak energy = 99.06GWh)
Wet energy : 411.76 GWh
Total energy : 674.30 GWh